History
History
History
1968 |
Close to MARUEI industrial company become independent at the official in charge of building gate and construct establishment FRP, lining and the special painting mainly in circle glorification mechanic |
1972 |
I produce it and install a corrosion resistance FRP duct in NIPPON STEEL CORP. Yahata and deal with various duct covers afterwards |
1973 | I transfer lining and sandblast with Wakamatsu factory new establishment and assume Ishiharacho factory an FRP primary occupation |
1974 | I design a corrosion resistance apparatus and the effluent gas waste fluid processing synthesis plant in NIPPON STEEL CORP. Yahata and perform production, installation |
1976 | I design suisaitokori*kito (chimney flue) in NIPPON STEEL CORP. Hirohata and undertake construction |
1977 | I deal with upsizing of the product, technical diversification and finish the large new factory. I try for technical study of the corrosion resistance FRP |
1978 | I perform patent application to depend on an FRP product and try for technical accumulation |
1980 | I challenge a thing demanded the exact production technology such as the parts for the Shinkansen vehicle from and act for the improvement of the production technology |
1981 | The first shipment of plant exports. Establishment of the engineering system consistent from software to hardware |
1982 | Use development by becoming it extends FRP in Kyushu Electric Power Co.,Inc. |
1983 | Establishment of a Mann type holder leak oil prevention method, the other seals method |
1984 | I work on the product development by the Technical Development Department, construction method development, design development |
1985 | Establishment of the consistency system until surface treatment line-related engineering - hard ... maintenance |
1986 | Quality control by the molding machine introduction, labor saving promotion (an FW molding machine: 25A - 600A) |
1987 | FW pipe -MK haikemipaipu beginning to sell. |
1989 | I open Mizushima branch office |
1991 | With full operation of large diameter pipe FW, I build more large factories and expand the site. |
2002 | The ISO 9001 certification acquisition. FW pipe full-line improves (FW machine enlargement) |
2006 | I open Keihin branch office |
2007 | It is the start of production of the large diameter structure scrubber by a cooperation company and collaboration in China |
2009 | I found Ogori factory |
2012 | Ho Chi Minh representative office establishment in Vietnam |
2015 | I open Chiba branch office |
2016 | The Ho Chi Minh representative office closure in Vietnam, MARUEI crimson (Vietnam) establishment |
2019 | I establish Wakamatsu factory |
2021 | I close Ogori factory |